Sign In | Join Free | My himfr.com
Home > Tower Erection Tools >

5 Ton Heavy Duty Double Capstan Cable Winch With Six Speed Gearbox

Ningbo Lingkai Electric Power Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 5 Ton Heavy Duty Double Capstan Cable Winch With Six Speed Gearbox from wholesalers
     
    Buy cheap 5 Ton Heavy Duty Double Capstan Cable Winch With Six Speed Gearbox from wholesalers
    • Buy cheap 5 Ton Heavy Duty Double Capstan Cable Winch With Six Speed Gearbox from wholesalers

    5 Ton Heavy Duty Double Capstan Cable Winch With Six Speed Gearbox

    Ask Lasest Price
    Brand Name : NBLK
    Model Number : JJCS JJQS
    Certification : ISO
    Price : Get the latest
    Delivery Time : 3-7 days
    Payment Terms : T/T
    Supply Ability : 500sets/month
    • Product Details
    • Company Profile

    5 Ton Heavy Duty Double Capstan Cable Winch With Six Speed Gearbox

    Product Description:

    Design and Production of the Three Tons Dual-Bull Wheel Winch

    The Three Tons Dual-Bull Wheel Winch is a machine designed and produced to cater to the needs of line construction. It is an ideal machine for traction and lifting tasks in field construction. This machine is mainly used for erecting pylons, traction wire laying, stringing, and other operations necessary for electricity, post and telecommunications line construction.

    This winch has a double capstan structure, causing very minimal damage to the wire rope. This design makes it popular with the power sector and construction units in China. In addition, our customer base across the globe has also expressed satisfaction with its performance.

    TECHNICAL DATA

    Item number09162A09162B09162
    ModelJJCS-50JJQS-50JJCS-50
    EngineModelDiesel EngineGasoline EngineDiesel Engine
    Power(KW)999
    Speed(rpm)200036002000

    Pull(KN)

    speed

    force/

    (M/MIN)

    Slow50/550/550/3.1,40/9.6
    Moderate25/9 14/1425/9 14/1445/7.1,17/22.3
    Fast8/228/2233/11.3,10/35.6
    Reverse-/5 -/9-/5 -/9-/7.35
    Drum bottom of groove diamete(MM)Φ230Φ230Φ300

    Features:

    Clutch & Hand Braking

    The clutch is responsible for transferring the power from the engine to the synchronous movement of the outer cone-shaped block, which is achieved through the pulley or elastic coupling device. The disengagement position is located in the middle position of the clutch.

    Please note that there are two bearings in the clutch, which are 6205-2Z and 51110. It is recommended to replace the bearings every 1000 hours or based on the actual operation. Lithium grease should be used to fill the bearings before assembling.

    Gearbox

    The gearbox consists of three sections, which are the shift section, the brake section, and the deceleration section.

    The shifting part is transformed into three forward gears and a reverse gear, achieved through high precision carburizing gear. The power is then passed to the clutch shaft through the reduction gear. We use an overrunning clutch as the machine's brake, which provides an automatic braking function. This, coupled with the aforementioned clutch handle control of the hand brake, means that the machine has two sets of brake devices to ensure construction safety.

    The deceleration section is made up of a three-stage reduction gear, which has a large transmission ratio, small size, and light weight.

    Applications:

    Three Tons Dual-Bull Wheel Winch

    The Three Tons Dual-Bull Wheel Winch is a versatile machinery that is used without power in outside fields. It is used as a traction and lifting machinery to meet the needs of mountainous areas and outside fields.

    The machine has a large traction capacity and is operated easily. Due to its unique double capstan design, the damage to the steel wire rope is minimal. The winch is comprised of an engine, clutch, gearbox (with brake), reel, and other components.

    Operating the winch is simple and it is easy to maintain and repair. Its simple design makes it a reliable and effective machinery for any outdoor project.

    Support and Services:

    Our Tower Erection Tools product comes with comprehensive technical support and services to ensure that our customers have the best experience. Our team of experts are available to assist with any technical issues and answer any questions you may have about the product. We provide installation services and can train your team on how to properly use the tools for safe and efficient tower erection. Additionally, we offer maintenance services to keep your equipment in top condition and minimize downtime. Contact us for any support or service needs related to our Tower Erection Tools.

    Packing and Shipping:

    Product Packaging:

    The Tower Erection Tools product will be packaged in a sturdy cardboard box to ensure the safety of the product during shipping. The box will include all the necessary tools and equipment required for tower erection, along with a user manual for easy reference.

    Shipping:

    The Tower Erection Tools product will be shipped through reliable courier services to ensure timely delivery to our customers. The shipping charges will be calculated based on the destination and weight of the package. Customers will receive a tracking number to track their shipment.

    Quality 5 Ton Heavy Duty Double Capstan Cable Winch With Six Speed Gearbox for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Ningbo Lingkai Electric Power Equipment Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)